Steps For The Construction Of Custom Gates

By Stephanie Turner


According to some people, good fences and gates would really reflect on the personality of a person, and thus, having a poor and an ugly design could not make the neighbors happy. In this article, simple steps on building strong panels and constructing gates will be shown. These tips also share about some information on the methods to achieve fastening, solid footings, and secure connections. One advantage of this is having low cost tools.

So before you can start on the construction processes, you first have to apply for a gate permit to the department for local building inspections in Palm Springs, CA. With this, as you go along with the application, you must be able to follow the regulations. These regulations for custom gates Palm Springs CA would include the requirements of setback ranging from the property lines of fences up to the maximum heights allowed.

The regulations usually may vary on different locations, so the gate may either be installed in the back or front yard, house corners, or adjacent to streets. Another important for you is to pass all the plans that you have made and these plans would include the over all dimensions of property such as the property lines, distances, outlines, and heights. All information are needed to be provided clearly.

So first is to put marks on the property lines. Marking may be done if you will hire a surveyor who is professional enough in doing the job. But when planning to do it just by yourself, you have to acquire a metal detector for scanning the areas. If that indicator will detect something, you may need to dig it to make sure that steel stake is there.

After you receive your gate permit, begin on laying out the fence posts. See to it that the space between each post has an even distance. Second is to set up the posts. During this process, first thing to so is to line up post edges by making use of the string line marks. Then after lining up is plumbing the posts on both directions before starting to brace the screws with the stakes.

The next step is leveling and installing lower rails. The height of these may depend on your own preference but make sure to have the best length so it can be easy to cut. The spaces in between the panels and the grounds may also depend on you, it may be higher or shorter. Then next is to lay out and to cut top rails. Between the posts, use straight board for marking each space. The panels are either stepped up or down for accommodating the changes in grades.

Fifth is installing the top rails and the fence panels. Pick a pair from each of the upper rails and lower rails then screw these to the cleats. See to it that nails are driven on the right angles. When both fence boards are driven already, check both of the sides if angles are correct.

Next is building the gates. When cutting and assembling the frames, do it in a flat surface. If the size of gates are the same as the fence panels, use the pattern of top rail when marking and cutting the top curve. But if not, you will have to make another pattern.

Lastly, hang your gates. Install first all the assembled hard wares. Be sure to make the block higher so that the ground is clear when opening. And also, be sure to check is hinges and screws are properly mounted.